FOAM OPERATIONS                                                                                                                                    SOG 3.19

UNITS EQUIPPED WITH EDUCTORS

Sergeant/Driver Operator will:

1. position apparatus
2. obtain the foam eductor and 5 gallon can of foam
3. connect eductor to an outlet (pump panel side)
4. check the eductor for a setting of 3%
5. open foam can and insert eductor pick-up tube
6. set up pump to deliver 200 psi engine pressure (minimum) to the 1 3/4" foam line
7. supply additonal foam cans as needed
Firefighter will:
1. pull 1 3/4" preconnected line
2. extend line to position
3. select proper stream for foam application
4. select proper stream for foam application, operate to best advntage
Company Commander will:
1. establish command, make size-up, develop and implement attack plan
2. direct engine and line placement
3. assist the Driver Operator with the eductor connection and opening
4. direct application of foam
5. assist in rescue, if necessary
When operating as a four person company the firefighter is responsible for the duties deemed necessary by the commanding officer.